Concrete volume calculator
Pick the shape and type the sizes: you get the cubic metres of concrete, with a margin, and the number of ready-mix bags.
Result
1.26 m³Concrete to order
- Exact volume (no margin)
- 1.2 m³
- 25 kg bags (≈ 11.6 L each)
- 109
- Or 35 kg bags (≈ 16.3 L each)
- 78
- Weight of dry mix
- 2,709 kg
Inputs
- Shape
- Slab
- Length
- 4
- Width
- 3
- Thickness
- 10
- Margin for waste
- 5
- Price per m³ (optional)
- 0
How it is calculated
Slab: length × width × thickness. Footing: length × width × depth.
Result
Concrete to order
- Exact volume (no margin)
- 1.2 m³
- 25 kg bags (≈ 11.6 L each)
- 109
- Or 35 kg bags (≈ 16.3 L each)
- 78
How it is calculated
- Slab: length × width × thickness. Footing: length × width × depth.
- Round column: π × radius² × height × number of columns.
- Solid stairs: each step is a block; volume = width × depth × height × n(n+1)/2.
- Add the margin, then: bags = volume ÷ yield of one bag, rounded up.
- Yield used: about 2,150 kg of dry mix per m³, so ≈ 11.6 L per 25 kg bag.
Example
A 4 m × 3 m × 10 cm slab: 1.2 m³. With a 5% margin: 1.26 m³, so 109 bags of 25 kg.
Good to know
- This is a guide for ordering: check on site and on the bag label.
- Bag yield depends on the brand. Above about 1 m³, a ready-mix truck is often easier.
- Steel bars, formwork and concrete strength are not calculated.
When to use it
- Order the right amount of concrete for a garden slab or a shed base.
- Count the bags needed to set fence posts or a small footing.
- For the gravel sub-base under the slab, use the Gravel calculator.
Frequently asked questions
How thick should a slab be?
About 10 cm is common for a path or a shed, and 12 to 15 cm or more for a car. Local rules and soil can call for more.
How long before I can walk on it?
Often after one or two days, but concrete gains most of its strength over about four weeks. Keep it damp the first days so it does not dry too fast.
Is a ready-mix truck worth it?
For large volumes, yes: it saves hours of mixing and gives a steady mix. Check the minimum order and the truck access first.